Project Brief: Environmental, Safety & Health Management of UJHEP which covers: Environmental compliance Safety & health compliance Construction supervision Specialist contractor(s) management Local people (Orang Asli) management Resettlements of villagers Stakeholders management Scope of project components includes: Drill and blast tunnels – 22km Access road construction – 40km Quarry operation and magazine management RCC (Roller […]
Continue ReadingProject : Palm Oil Industrial Cluster (POIC) Lahad Datu Phase 1 & Phase 2 (Total Area: 1,150 Acres)
Project Brief: Project Management, Engineering Design and Construction Supervision of POIC Lahad Datu Project – a high impact project for Sabah State Scope of works in POIC Lahad Datu Phase 1 & Phase 2 includes: Land acquisition Planning of industrial park Technical specifications for integrated infrastructures and utilities Detailed engineering design for integrated infrastructures and […]
Continue ReadingProject : River-of-Life (ROL) Precinct 7 Package (Heritage Package)
Project Brief: Project Management of beautification works along 1.3km of Klang River along the heritage area within Kuala Lumpur Scope of project management services includes: Scope management Technical specifications Design management Construction supervision Work progress tracking Stakeholders management Cost and variation management Safety, health, and environmental compliance Corporate social responsibility (CSR) Note: Project Manager of […]
Continue ReadingProject: Application of Ionic Nano Copper (INC) in Fungi and Disease Control at Pineapple Farms in Fruit Valley, Kuala Selangor
Project Brief: Application of INC which is a mineral-based foliar spray that offers superior performance at low doses to control and prevent fungal and bacterial plant diseases at the pineapple farms INC provides these benefits: Utilizes the natural antimicrobial properties of mineral ions, presents minerals in their most biologically active form Superior biological efficacy of […]
Continue ReadingProject: Application Duo Function Agent for Physical Chemical Treatment for Wastewater (Industrial Effluent) at a Plastic Scraps Separation Plant in Klang, Selangor
Project Brief: Substitution of conventional coagulant and flocculant (chemical-based materials) using green mineral-based duo function agent to perform coagulation, flocculation, and sedimentation using a single green product Sludge produced shall be non-chemical and non-hazardous sludge and no chemical residues in the treated effluent Commenced operation in January 2020
Continue ReadingProject: Composting Machine for Segregated Organic Wastes (or Food Wastes) for Fast & Rapid Composting at Kayu Madang Sanitary Landfill, Kota Kinabalu, Sabah
Project Brief: Rapid composting machine with a daily capacity of 1 metric tonne of segregated organic wastes from municipal solid waste (MSW) over 8 – 12-hour cycle for complete composting Composts produced shall be allowed to cool and mature over 48 hours by means of natural drying under the roofed area Completed in March 2020
Continue ReadingProject : Basal Treatment of Engineered Landfill Cell using Lime Stabilisation at Pulau Burung Sanitary Landfill, Penang
Project Brief: Lime stabilization for construction of stabilized subgrade of 300-350mm thick at the base and side slopes of the engineered landfill cell (first cell) Subgrade materials are of marine clay nature which is soft, soggy, and with low permeability Completed the first cell in June 2019
Continue ReadingProject: Erosion & Sediment Control Plan (ESCP) at Various Construction Sites
ESCP Project List (2016 – Current): ESCP for Sewage Treatment Plant at Sandakan, Sabah ESCP for Sewage Treatment Plant at Hospital Tawau Extension Project, Sabah ESCP for Klang Valley MRT SSP Line (Line 2) – Sentul West Station (STWS), Kuala Lumpur ESCP for Klang Valley MRT SSP Line (Line 2) – Titiwangsa Station (TTWS), Kuala […]
Continue ReadingProject : Phase 3 Development of Pulau Burung Sanitary Landfill, Penang
Project Brief: Materials recovery facilities (MRF) plant for the daily processing of 2,000 metric tonnes of municipal solid waste (MSW) Engineered vertical landfill cells (6 numbers) for a daily landfilling capacity of 1,400 metric tonnes Basal treatment using lime stabilization technique Designed with a leachate collection system Designed with gas collection structures for future gas […]
Continue ReadingProject : Leachate Treatment Plant (LTP) at Pulau Burung Sanitary Landfill, Penang
Project Brief: Daily Treatment Capacity of 2,000m3 of Raw Leachate System Configuration using Anaerobic MBBR (Moving Bed Bio-Reactor) Biological Treatment, Green Chemical Physical Treatment, Aerobic MBBR Biological Treatment, Membrane Bio-Reactor (MBR) and Nano Filtration (NF) Completed in March 2020